Projects

Results, not promises

A selection of recent assignments: the client's challenge, the solution adopted, the result achieved.

Recent projects

Self-supporting steel staircase for an automated warehouse
Steel structures & automated warehouses

Self-supporting steel staircase for an automated warehouse

Self-supporting steel staircase providing maintenance access to the levels of an automated warehouse. An external structure over 23 m high, verified for seismic, wind and snow actions.

View the project →
Photovoltaic carport for two parking spaces
Steel structures & photovoltaics

Photovoltaic carport for two parking spaces

Steel carport for two covered parking spaces, with a dual-pitch roof facing east and west carrying 16 photovoltaic modules of 470 W each, for a total of 7.52 kWp.

View the project →
🏗️
Structural engineering

Seismic verification of pallet racking

The challenge: a high-density warehouse in a seismic zone with racking lacking up-to-date calculation documentation, to be verified without halting operations.

The solution: geometric survey, FEM modelling and seismic response spectrum analysis to EN 15512 and EN 16681.

The result: structures verified, load notices updated, zero days of warehouse downtime.

📐
Design

Turnkey industrial mezzanine

The challenge: doubling the company's usable floor area without extending the building, on a tight delivery schedule.

The solution: parametric 3D modelling in SAP2000, profile optimisation and a complete NTC 2018 calculation report for filing.

The result: design delivered on schedule, structure built and tested.

⚙️
Statutory procedures

Notification of pressure tanks

The challenge: a plant manufacturer with pressure tanks to be placed in service in compliance with directive 2014/29/EU.

The solution: thickness verification calculations, preparation of the technical documentation and full management of the CIVA procedure.

The result: tanks notified and in service with no findings from the inspection body.

🔬
Product development

Qualification of a new racking system

The challenge: a manufacturer needed to place a new pallet racking line on the market with certified load capacities, valid also in seismic zones.

The solution: a campaign of laboratory experimental tests on components and connections, FEM analyses correlated with the results, and product certification to EN 15512 and EN 16681.

The result: qualified system, certified load tables and compliant marking, ready for sale.

Your project could be next

Tell us about your technical requirement.

Request a free quote